
Construction Progress
Available on requestTrack construction progress as a monthly built share of the site and of the planned footprint. For each month since the start date, the pipeline measures built ground with the same rule, ensuring the series is directly comparable from one month to the next. Every monthly figure is reported beside the true-colour image it was read from. Drawdown requests can be checked against the ground before funds are released.
Built for construction lenders, project finance teams, and insurers covering a build in progress.
Core Capabilities
Drawdown Checks
Each monthly built share sits beside the dated image it was read from.
Consistent Series
One rule applied to every month keeps the series directly comparable.
Plan Comparison
Built share is reported inside the planned footprint as well as across the whole site.
What It Looks Like

Inputs and Deliverables
Inputs Required
- Site boundary (GeoJSON, zipped shapefile, or KML).
- Construction start date.
- Planned footprint as a single shape, if available.
Deliverables
- Monthly table reporting the built share of the site, the share of the planned footprint, and the number of clear scenes.
- True-colour image for each of the six most recent months.
- Built ground map layer for the latest month (GeoJSON, KML, or shapefile).
- Sentinel-1 radar figure for the first and latest months, printed beside the series.
Methodology and Sources
Public Sources: Copernicus Sentinel-2, Copernicus Sentinel-1.
Commercial Sources: High-resolution imagery via our partner SkyFi (on request).
Limits of Detection
Analysis measures the share of built ground. Structural completion, interior works, and build quality are not assessed.
The same classification rule is applied to every month across the most recent 18 months, matching a build in progress and a lender’s drawdown schedule. Months without a clear scene are marked in the table and never interpolated.
Where individual structures on a site must be separated, we scope commercial imagery via SkyFi.
Workflow
Submit the Site
Provide the site boundary, the start date, and the planned footprint if available.
Monthly Measurement
Built ground is measured for every month since the start with the same rule.
Image Pairing
Each figure is paired with the dated true-colour image it was read from.
Delivery
You receive the monthly table, the images, the built ground layer, and the radar figures.
Use Cases
Construction Lenders
Check each drawdown request against the month’s built share and image.
Project Finance Teams
Track several builds on one monthly cadence without a site visit each month.
Insurers Covering a Build
Establish how far works had progressed in a given month, with a dated image on file.
Measured Results
Each figure is printed with its denominator and scope in the paper it links to.
- 17 of 18
- months read at a construction site in Grünheide, Brandenburg, with 44 percent of the site read as built by June 2022
Related Solutions
Asset Status Check
Measure each asset against its own three-year history and flag the sites that changed beyond their usual range.
Portfolio Monitoring
Track a registered book in one view, with the latest flood, fire, forest and site records and changed assets first.
Damage Mapping
Map changed ground after a flood, fire, storm or spill, isolate built-up damage, and screen nearby water.
Submit Ten Closed Claims
Provide ten claims from last season that are already settled. Our team reads them back so your adjusters can set the record beside their own findings.
